Gledhow School, Leeds
The fast track build nature of Pro-Clad enabled this school building to be transformed to brickwork over the Easter school shutdown. A cabin building required brick slip cladding to match the main school building. 120sqm of the Pro-Clad™ Panel System was installed and pointed during the school Easter shut down in April 2012.