Fab Lite Facades

  • Home
  • About us
  • Pro-Clad
    • Pro-Clad Explained
    • Pro-Clad 1
    • Pro-Clad 2
    • Pro-Clad 3
    • Case Studies
  • Pro-Steel
    • Pro Steel Bolt up
    • Pro-Steel Lintels
    • Case Studies
  • Gallery
    • Pro-Clad >
      • Pro Clad 1
      • Pro Clad 2
      • Pro Clad 3
    • Pro-Steel >
      • Pro Steel Bolt Up
      • Pro Steel Lintels
    • Bespoke Cladding
  • Architects Lounge
    • Fab-Lite Facades >
      • Pro-Clad
      • Pro-Steel >
        • Pro-Steel Lintels
        • Pro-Steel Bolt Ups
    • Fab-Lite >
      • Chimneys
      • Arches
    • Resources >
      • Brochures
      • Fixing Details
      • Certifications
  • News
  • Contact
  • Home
  • About us
  • Pro-Clad
    • Pro-Clad Explained
    • Pro-Clad 1
    • Pro-Clad 2
    • Pro-Clad 3
    • Case Studies
  • Pro-Steel
    • Pro Steel Bolt up
    • Pro-Steel Lintels
    • Case Studies
  • Gallery
    • Pro-Clad >
      • Pro Clad 1
      • Pro Clad 2
      • Pro Clad 3
    • Pro-Steel >
      • Pro Steel Bolt Up
      • Pro Steel Lintels
    • Bespoke Cladding
  • Architects Lounge
    • Fab-Lite Facades >
      • Pro-Clad
      • Pro-Steel >
        • Pro-Steel Lintels
        • Pro-Steel Bolt Ups
    • Fab-Lite >
      • Chimneys
      • Arches
    • Resources >
      • Brochures
      • Fixing Details
      • Certifications
  • News
  • Contact

Student Accommodation, ​Oxford

Pro-Clad was used with an Austrian Timber Framed system for this Student Accommodation project in Oxford which was completed to an especially tight build program throughout the winter months.
The Main Contractor (Exel Construction) were importing an Austrian timber frame fast build system (manufactured and installed by EBS elk ​for student accomodation in Oxford and required a brick cladding system that enabled the tight programme to be met despite the poor weather conditions through an extremely cold and snowy winter.

As well as the weather conditions, the brickwork bond pattern was stack bond and this also meant traditional masonry was deemed inappropriate. Having looked at a number of UK and European systems, the decision was made to use Pro-Clad™ and the vertical columns were made on an special insulated SIPS version of Pro-Clad™ with horizontal panels and larger areas on standard stack bonded Pro-Clad™. 

Despite temperatures as low as -10 degree C and at times 6" of snow, no site days were lost and the two buildings were completed on time to the satisfaction of all parties.

 click an image below to enlarge and scroll through
Picture
VIEW MORE PRO-CLAD CASE STUDIES
Contact us
BRICK CLADDING
Pro-clad 1 System
​Pro-clad 2 System
​Pro-clad 3 System
​Recent Case Studies
PRO STEEL
Pro Steel
Pro Steel Bolt Up
Pro Steel Lintel
Recent Case Studies

​
​
ABOUT US
Gallery
Contact us
​Privacy Policy
Terms & Conditions


Fab-Lite Facades Ltd
82 Lime Pit Lane, Stanley, ​Wakefield WF3 4DF
Telephone 01924 828 362
Email: sales@fab-lite.co.uk
​
(c) 2020 Fab-Lite Facades Ltd | All Rights Reserved